Details of works:

  1. Electrical works for installation of split A/C at Seminar Hall and CAD lab (Two A/C’s in each room, 2 Ton A/C)
  2. Electrical work for installation of welding machines in the Advanced Metal Joining Lab.
  3. Electrical works for installation of water purifier at industrial block